|
Written by Fienso Suharsono
|
|
Friday, 17 July 2009 |


Spesifikasi | Pondasi | Batu kali
| Dinding
| Batako, diplester, dicat
| | Lantai | Keramik
| Plafon
| GRC/Setara
| Atap
| Genteng Beton
| Rangka Atap
| Baja Ringan
| Sanitair
| Bak Mandi Fiberglass, Closet jongkok
| Pintu depan
| Pintu double tripleks
| Kamar mandi & WC
| Pintu PVC, dinding dicat minyak
| Instalasi Listrik
| PLN 900 watt
| Air bersih
| PDAM
| | Harga | Rp 57.819.000
| *harga berubah sewaktu-waktu tanpa pemberitahuan |
Cara Pembayaran Tunai | Tanda jadi | Rp. 1.000.000
| hari ke-1 | | Uang Muka | 20% dikurangi tanda jadi | hari ke-15 | | Sisa | 80% | hari ke-31 | Cara Pembayaran Tunai Keras (12 bulan) | Tanda jadi | Rp. 1.000.000
| hari ke-1 | | Uang Muka | 50% dikurangi tanda jadi | hari ke-15 | | Sisa | 50% diangusr 12 bulan. Angusuran ke-1 | hari ke-31 |
Cara Pembayaran KPR | Tanda jadi | Rp. 2.500.000
| hari ke-1 | | Uang Muka | 10% dikurangi tanda jadi | hari ke-15 | | Sisa | 90% | |
Catatan:- Harga sudah termasuk akta jual beli, BBN sertifikat HGB, biaya perolehan hak atas tanah dan bangunan (BPHTB), IMB, listrik 1300 wat, dan air PDAM.
- Harga belum termasuk biaya proses KPR (khusus, pembelian lewat KPR).
- Harga belum termasuk harga hoek (khusus pembelian lokasi sudut/luas tanah tidak standar, ada kelebihan tanah.
- Ilustrasi perhitungan KPR hanya merupakan perkiraan. Nilai perhitungan sebenarnya akan dikeluarkan bank.
- Bunga KPR dapat berubah sewaktu-waktu.
- Harga dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu.
Daftar Harga Rumah (per April 2009)
LB/LT
| Tunai
| 12 bulan
| KPR
| DP10%
| Angsuran KPR/bln (Bunga 12%)
| 5th
| 8th
| 10th
| 15th
| | 21/72 | 57.819.000 | 62.132.925
| 60.694.950
| 5.781.900
| 1.256.338 | 933.014
| 831.418
| 798.882
| 30/72
| 78.031.800
| 83.884.185
| 81.933.390
| 7.803.100
| 1.695.826
| 1.259.397
| 1.122.262 | 925.701 | 36/90
| 95.634.000
| 102.806.550
| 100.415.700
| 9.563.400 | 2.078.573 | 1.543.643 | 1.122.262
| 1.172.824
| 38/120
| 136.521.000
| 146.760.075
| 143.347.050
| 13.652.100 | 2.968.270 | 2.204.373
| 1.964.338
| 1.674.831 | 47/150
| 175.098.00
| 188.230.350
| 183.852.900
| 18.823.035 | 2.826.382 | 2.826.382
| 2.518.617
| 2.147.419
|
Daftar Harga Rumah (per 7 Juli 2008, harga lama sbg permbanding) Tipe, LB/LT
| Tunai
| 12 bulan
| KPR
| DP10%
| Angsuran KPR/bln (Bunga 12%)
| 5th
| 8th
| 10th
| 15th
| | 21/72 | 55.582.500 | 59.728.688
| 58.346.625
| 5.834.663 | 1.168.100 | 853.469 | 753.394 | 630.232 | 27/72
| 70.166.250
| 75.428.719
| 73.674.563
| 7.367.456
| 1.474.965
| 1.077.679
| 951.314
| 795.797
| 36/90
| 91.476.000
| 98.336.700
| 96.049.800
| 9.604.980
| 1.922.917
| 1.404.974
| 1.240.232
| 1.037.483
| 38/120
| 131.554.500
| 141.421.088
| 138.132.255
| 13.813.223
| 2.765.408
| 2.020.537
| 1.783.617
| 1.492.037
| 7/47/150
| 165.338.250
| 177.738.619
| 173.605.163
| 17.360.516
| 3.475.576
| 2.539.419
| 2.241.657
| 1.875.198 |
|
|
Last Updated ( Tuesday, 27 October 2009 )
|