Harga 6 Desember 2017 Bukit Tectona Siap Huni
Blok/No | Tipe | LB | LT | Harga | Harga | Harga |
Tunai | 12 bulan | KPR ke-1 | ||||
CB.08/16 | Tectona 4 | 38 | 120 | 356,950,000 | 398,344,250 | 387,545,750 |
Modal Pertama = DP + Biaya KPR, lihat promo
Blok/No | Tipe | LB | LT | Harga | DP | 5% | PLAFON KPR | Estimasi | Modal Pertama |
KPR ke-1 | Biaya KPR | DP+ biaya KPR | |||||||
CB.08/16 | Tectona 4 | 38 | 120 | 387,545,750 | 19,377,288 | 368,168,463 | 18,408,423 | 37,785,711 |
Estimasi Angsuran dengan asumsi bunga 6.10% KPR BCA
Blok/No | Tipe | LB | LT | Harga | Angsuran KPR/bln (Tahun)| Bunga | 6.10% | ||
KPR ke-1 | 5 | 10 | 15 | 20 | ||||
CB.08/16 | Tectona 4 | 38 | 120 | 387,545,750 | 7,134,860 | 4,105,938 | 3,126,741 | 2,658,957 |