Harga 8 Oktober 2014
| Tipe | Harga | Harga | Harga | Harga | Harga |
| LB/LT | Tunai | 12 bulan | 24 bulan | KPR ke-2 | KPR ke-1 |
| Chrysant 1, 36/72 | 162.162.000 | 182.432.250 | 194.594.400 | 186.486.300 | 178.378.200 |
| Chrysant 1A, 36/78 | 169.092.000 | 190.228.500 | 202.910.400 | 194.455.800 | 186.001.200 |
| Chrysant 2 36/90 | 200.623.500 | 225.701.438 | 240.748.200 | 230.717.025 | 220.685.850 |
| Chrysant 3, 38/120 | 289.789.500 | 326.013.188 | 347.747.400 | 333.257.925 | 318.768.450 |
| Chrysant 3A, 38/136 | 310.579.500 | 349.401.938 | 372.695.400 | 357.166.425 | 341.637.450 |
DP 5% + Biaya KPR = Modal pertama
| Tipe | Harga | DP 5% | PLAFON KPR | Estimasi | Modal Pertama |
| LB/LT | KPR ke-1 | bea KPR | DP+ bea kpr | ||
| Chrysant 1, 36/72 | 178.378.200 | 8.918.910 | 169.459.290 | 8.472.965 | 17.391.875 |
| Chrysant 1A, 36/78 | 186.001.200 | 9.300.060 | 176.701.140 | 8.835.057 | 18.135.117 |
| Chrysant 2 36/90 | 220.685.850 | 11.034.293 | 209.651.558 | 10.482.578 | 21.516.870 |
| Chrysant 3, 38/120 | 318.768.450 | 15.938.423 | 302.830.028 | 15.141.501 | 31.079.924 |
| Chrysant 3A, 38/136 | 341.637.450 | 17.081.873 | 324.555.578 | 16.227.779 | 33.309.651 |
Angsuran KPR ke-1 dengan dp 5% dan asumsi bunga 9.75%
| Tipe | Harga | DP 5% | PLAFON KPR | Angsuran KPR/bln (Bunga 9.75%) | ||
| LB/LT | KPR ke-1 | 5th | 8th | 10th | ||
| Chrysant 1, 36/72 | 178.378.200 | 8.918.910 | 169.459.290 | 3.579.699 | 2.549.041 | 2.216.023 |
| Chrysant 1A, 36/78 | 186.001.200 | 9.300.060 | 176.701.140 | 3.732.678 | 2.657.974 | 2.310.725 |
| Chrysant 2 36/90 | 220.685.850 | 11.034.293 | 209.651.558 | 4.428.731 | 3.153.621 | 2.741.618 |
| Chrysant 3, 38/120 | 318.768.450 | 15.938.423 | 302.830.028 | 6.397.055 | 4.555.231 | 3.960.116 |
| Chrysant 3A, 38/136 | 341.637.450 | 17.081.873 | 324.555.578 | 6.855.991 | 4.882.031 | 4.244.221 |
DP 30% + Biaya KPR = Modal pertama
| Tipe | Harga | DP 30% | PLAFON KPR | Estimasi | Modal Pertama |
| LB/LT | KPR ke-2 | bea KPR | DP+ bea kpr | ||
| Chrysant 1, 36/72 | 186.486.300 | 55.945.890 | 130.540.410 | 6.527.021 | 62.472.911 |
| Chrysant 1A, 36/78 | 194.455.800 | 58.336.740 | 136.119.060 | 6.805.953 | 65.142.693 |
| Chrysant 2 36/90 | 230.717.025 | 69.215.108 | 161.501.918 | 8.075.096 | 77.290.203 |
| Chrysant 3, 38/120 | 333.257.925 | 99.977.378 | 233.280.548 | 11.664.027 | 111.641.405 |
| Chrysant 3A, 38/136 | 357.166.425 | 107.149.928 | 250.016.498 | 12.500.825 | 119.650.752 |
Angsuran KPR ke-2 dengan dp 30% dan asumsi bunga 9.75%
| Tipe | Harga | DP 30% | PLAFON KPR | Angsuran KPR/bln (Bunga 9.75%) | ||
| LB/LT | KPR ke-2 | 5th | 8th | 10th | ||
| Chrysant 1, 36/72 | 186.486.300 | 55.945.890 | 130.540.410 | 2.757.567 | 1.963.615 | 1.707.080 |
| Chrysant 1A, 36/78 | 194.455.800 | 58.336.740 | 136.119.060 | 2.875.412 | 2.047.530 | 1.780.032 |
| Chrysant 2 36/90 | 230.717.025 | 69.215.108 | 161.501.918 | 3.411.606 | 2.429.345 | 2.111.964 |
| Chrysant 3, 38/120 | 333.257.925 | 99.977.378 | 233.280.548 | 4.927.875 | 3.509.053 | 3.050.615 |
| Chrysant 3A, 38/136 | 357.166.425 | 107.149.928 | 250.016.498 | 5.281.409 | 3.760.799 | 3.269.472 |
Note:
- Harga dan stok berubah setiap saat.
- Harga resmi adalah harga yang tertera di surat pesanan rumah (SPR).
- Angsuran resmi adalah angsuran yang dirilis bank di Surat Persetujuan KPR atau offering letter (SP3K) bank pemberi kredit kepemilikan rumah (KPR).
- Harga mengikat selama 3 bulan, jika dalam 3 bulan belum akad, maka akan dikenakan penyesuain harga baru.
- Harga belum termasuk charge taman, jika di samping/depan rumah terdapat taman atau jalur hijau.
- Jika KPR ditolak bank maka akan dipotong biaya administrasi Rp 2.5 juta (tarif saat ini, berubah setiap saat) dari uang konsumen yang sudah masuk.
- Aturan atau kebijakan lain dapat dibaca di surat pesanan rumah (SPR).
- Untuk menghindari salah paham, baca dengan teliti pasal-pasal atau syarat dan ketentuan di surat pesanan rumah.